Office fit-out contractor in Singapore.

We plan the works back from the day your team needs to move in.

Fitted-out open plan with white workstations, orange screens and timber-clad columns, 78 Shenton Way

What a fit-out with us includes.

  • Space planningTest-fits against your headcount, before or after you sign the lease.
  • Ceilings, lighting, powerLights, power points and data placed around where people actually sit.
  • Air-con and fire safetyM&E changes designed to the building's rules and agreed with management.
  • Partitions and glassMeeting rooms, glass fronts with frosting bands, doors and hardware.
  • JoineryReception counter, pantry cabinets, storage walls and display units.
  • FlooringCarpet tiles and vinyl laid in zones, so walkways read apart from desks.
  • FurnitureWorkstations, chairs and loose furniture sourced to your budget.
  • Submissions and handoverLandlord fit-out submission, approvals, defects list and keys.
Newly fitted open plan with oak benching and white screens, chairs still wrapped before move-in

From bare unit to move-in day.

The full six steps
  1. Measure and test-fit

    We survey the unit, read the landlord's fit-out guide and test how many desks and rooms the floor really holds.

  2. Design and quote

    Layout, finishes and 3D views, then an itemised quote you can check line by line.

  3. Submit and build

    Landlord and authority submissions go in, then M&E, partitions, ceilings, joinery and flooring on site.

  4. Furnish and hand over

    Furniture in, defects closed, a walkthrough with you and the keys handed back on time.

Priced per sqft, by finish level

What the unit already has and the finish you choose move the number most. Tell us your floor area and we send the range from our own past projects.

Work out your range
Planned back from your lease date

Landlord approvals come first, then the site works. We fit both inside the rent-free fit-out period your landlord gives you.

See the timeline

Fit-outs for tech and IT teams.

Glass-walled meeting room with a wall screen and long table, New Tech Park

A technology office fit-out covers everything a normal fit-out does, plus the things a team on screens and calls all day needs. Metadesign Interior plans these in at layout stage, not after the ceiling is closed.

More on planning for tech teams in our IT office interior design guide.

  • Comms or server roomA ventilated room with its own cooling and power, placed where cable runs stay short.
  • AV-ready meeting roomsScreens, conduits and power at the table, so video calls work on day one.
  • Tidy cablingData and power routed to every desk under trays and in ceilings, not across the floor.
  • Focus rooms and boothsPlaces to take a call or work heads-down away from the open plan.

Fit-out questions.

In short. An office fit-out turns a bare or used unit into a working office: layout, ceilings, lighting, power and data, partitions, joinery and furniture. Metadesign Interior runs the whole fit-out under one contract, with the schedule planned back from the end of your rent-free fit-out period.

A fit-out sets up a unit you are moving into, often from a bare shell. A renovation reworks an office you already occupy. Metadesign Interior does both; the fit-out usually runs against a lease start date, the renovation against your working week.

Metadesign Interior prices fit-outs per sqft in three finish levels, based on its own past projects. A Signature finish with feature joinery and full acoustics sits at the top. The budget calculator gets you a first range, and our office fit-out cost per square foot guide shows market ranges.

Yes, and it often saves money. We test-fit the units on your shortlist, check the building's fit-out rules and flag costly surprises, such as air-con or fire safety changes, before you commit.

Yes. JTC requires its approval for all fitting-out works in its buildings, temporary or permanent, before work starts, on top of any authority clearance. Metadesign Interior prepares that submission and builds the wait into your schedule. See JTC's fitting-out rules.

Yes. Workstations, chairs, meeting tables and loose furniture are sourced and installed as part of the same contract, so delivery is timed with the build and nothing arrives into a dusty site.


Got the keys date? Start the fit-out plan now.

Send your floor area, building and the date your fit-out period starts. We come back with a first range and a timeline that fits inside it.

WhatsApp us

Your details are only used to answer this enquiry.